Sand Control in Well Construction and Operation

Sand Control in Well Construction and Operation

AngličtinaPevná väzbaTlač na objednávku
Matanovic Davorin
Springer, Berlin
EAN: 9783642256134
Tlač na objednávku
Predpokladané dodanie v stredu, 3. júla 2024
101,21 €
Bežná cena: 112,45 €
Zľava 10 %
ks
Chcete tento titul ešte dnes?
kníhkupectvo Megabooks Banská Bystrica
nie je dostupné
kníhkupectvo Megabooks Bratislava
nie je dostupné
kníhkupectvo Megabooks Košice
nie je dostupné

Podrobné informácie

Produced sand causes a lot of problems. From that reasons sand production must be monitored and kept within acceptable limits. Sand control problems in wells result from improper completion techniques or changes in reservoir properties.
The idea is to provide support to the formation to prevent movement under stresses resulting from fluid flow from reservoir to well bore. That means that sand control often result with reduced well production. Control of sand production is achieved by: reducing drag forces (the cheapest and most effective method), mechanical sand bridging (screens, gravel packs) and increasing of formation strength (chemical consolidation). For open hole completions or with un-cemented slotted liners/screens sand failure will occur and must be predicted. Main problem is plugging. To combat well failures due to plugging and sand breakthrough Water-Packing or Shunt-Packing are used.
EAN 9783642256134
ISBN 3642256139
Typ produktu Pevná väzba
Vydavateľ Springer, Berlin
Dátum vydania 22. februára 2012
Stránky 200
Jazyk English
Rozmery 235 x 155
Krajina Germany
Čitatelia Professional & Scholarly
Autori Cikes Marin; Matanovic Davorin; Moslavac Bojan
Ilustrácie VII, 200 p.
Séria Springer Environmental Science and Engineering